Activities for this past week included;
- Retaining wall footings
- Creating and testing pads in line with civil engineer advice
- Structural engineer inspection (passed)
- Poured retaining wall footings – concrete pour went ahead on 25/11
Planned activities for next week (weather permitting) are;
- Bulk remove and stockpile unsuitable fill
- Blockwork walls