On Friday, 19/04/2024, the installation of the remaining tilt panels was completed, giving us a greater glimpse into how the church will look when complete.

The perimeter of the three main doors into the 1st-floor main church is now visible.

The Three eastern niches that will be in front of the three alters are taking shape.

The installation of the final tilt panel for the eastern facade.